M28 Steering

5 results

The High Court ruled in December that a €220m plan to upgrade the N28 road was properly assessed by An Bord Pleanála.

A campaign group representing up to 10,000 Co Cork residents is to seek to overturn a High Court decision which allows Transport Infrastructure Irelan(...)

The High Court  dismissed a challenge to An Bord Pleanála’s approval for the 14km M28 motorway between Cork and Ringaskiddy

A campaign group is to meet with its legal advisors this week to consider whether to lodge an appeal against a High Court decision to dismiss their ch(...)

The decision by Bord Pleanála last July to grant planning permission for the upgrade of the N28 from Ringaskiddy to the Bloomfield Junction on the N40 South Ring Road was controversial.

A judicial review sought by a group representing 10,000 Cork residents against An Bord Pleanála’s decision to grant planning permission for a €220 mil(...)

The approved upgrade of the N28 in Cork will ‘have a huge impact on the local communities in Rochestown and Douglas in terms of increased traffic, noise and visual amenity’, local residents have said.

The decision by An Bord Pleanála to grant planning permission for a €220 million upgrade of the N28 road from Cork to Ringaskiddy has been welcomed by(...)

The proposed €220 million upgrade of the existing N28 from Cork to Ringaskiddy to a motorway will create a port motorway but will fail to provide either strategic connectivity to Cork Airport or a proper linkage to the existing N40 Southern Ring Road around Cork, an oral hearing has been told. Photograph: iStock

The proposed €220 million upgrade of the existing N28 from Cork to Ringaskiddy to a motorway will create a port motorway but will fail to provide eith(...)